Project summary
Projects completed
From three-week fit-outs to fifteen-month upgrades, much of our work is delivered on sites that never close.
Darrell Lea logistics warehouse
Removed the existing high hazard sprinkler system from four-tier racking and roof space. Designed, supplied and built a new ESFR sprinkler system, valve room and pump sets.
Live site15 months
Town Hall Station hydrant upgrade
For Sydney Trains. Removed the existing hydrant system and installed a new hydrant system and pump set to current Australian Standards in an operating station.
Live site12 months
Circular Quay Station hydrant upgrade
For Sydney Trains. Replaced the station's hydrant system and pump set to bring it up to current Australian Standards while the station stayed open.
Live site12 months
Customs House, Circular Quay
Removed the existing hydrant system and installed a complete new system, coordinated around an operating building with most of the work done at night.
Live site6 monthsCompleted 2026
Optus satellite & exchange, Riverwood
Designed, supplied and installed a pre-action sprinkler system in a live data centre.
Live site8 months
99 Macquarie Street, Sydney
Hydrant and sprinkler system upgrade across levels 1 to 7 as part of a building refurbishment.
4 months
Defence facility deluge system
Deluge fire system for a high-clearance occupied building.
6 monthsCompleted 2026
Defence power supply facility
Designed, supplied and installed a gaseous fire suppression system for a new power supply facility.
6 monthsIn progress
Australian Border Force, Neutral Bay
Designed, supplied and built the site's fire hydrant system upgrade.
4 months
Supplement laboratories
Designed, supplied and installed a fire sprinkler system in operating laboratories.
Live site3 months
Flemington Markets
Consulting, engineering, design and installation of fire services in a live production warehouse.
Live siteOngoing
Darrell Lea flammable goods storage
Designed, engineered and built a fire sprinkler system for flammable goods racking storage.
4 months
Darrell Lea fire upgrade
Upgraded the fire indicator panel, detection and occupant warning system.
6 monthsCompleted 2024
Central Station Eddie Avenue
Supplied and installed the fire sprinkler system for the escalator and lift upgrade.
3 weeks
NDIS boarding house, Guildford
Supplied and installed a fire sprinkler system to the consultant's drawings.